Only one picture to show for today's session. Basically everything was clecoed together and final drilled. I was a little unsure of the elevator horns when I was clecoing them on as they seem to fit a little loose. I ended up clecoing all of the holes on each horn before drilling so it all worked out in the end.
0 Comments
Earlier in section 9 the plans had you bend the close out tabs on both the top and bottom skins. Although dimensions were provided in the plans I must have mis-marked my measurement on the actual skins. I didn't find this out until I clecoed the shear clip in place that is supposed to rivet to the close out tabs and the spar.
This snafu had me calling Van's on Monday morning to see what the alternatives were. My proposal was to fabricate another shear clip that would reach the close out tab. Van's agreed that would work but would end up leaving a 1/4" gap (rather than 1/8") between the closeout tab and the trim tab. The extra space in the gap would be purely cosmetic and create no performance issues. I'm ok with that since I'm not building a show plane. A rare mid week work session came to a quick halt when I became confused as to how the tip rib assemble fits together with the spar assemble on the elevator. I posted my question on VAF.
If all days in the "factory" could seem as satisfying as today I'd build 20 airplanes. Today was a marathon session that seemed to fly by with quite a bit to show for it in the end. The picture below shows where the trim servo will be mounted. Although the motor/mount skid is removable, the servo itself is pop riveted to the mounts. I don't like the idea of have such a permanent mount so I'll probably end up adding some sort of removeble mounting system.
The amount of work accomplished vs the time spent today didn't seem right. After ~3-4 hours this is all I had to show for.
I had a few hours this evening to get started on the elevator since I am at a standstill with the HS. Man there are a ton of parts in the elevator!! One part at time, one part at a time....
|